North Pole Mysteries

    This package has been deprecated

    Author message:

    This project has moved to critical-css-server

    critical-path-server

    0.0.6 • Public • Published

    DEPRECATED

    This project has been renamed and moved to: critical-css-server.

    Eliminate render-blocking CSS in above-the-fold content

    If you've run Google Pagespeed Insights on your web app, you might have seen this message:

    Eliminate render-blocking JavaScript and CSS in above-the-fold content

    Your page has blocking CSS resources. This causes a delay in rendering your page. None of the above-the-fold content on your page could be rendered without waiting for the following resources to load. Try to defer or asynchronously load blocking resources, or inline the critical portions of those resources directly in the HTML.

    This server generates the critical path CSS for you. It is designed to sit alongside your production app, and prepare the critical CSS asynchronously.

    Builds can be started after each deploy, and a few seconds later, you'll be able to defer or asynchronously load blocking resources, and inline the critical portions for your page.

    Install

    npm i critical-path-server

    DownloadsWeekly Downloads

    0

    Version

    0.0.6

    License

    MIT

    Last publish

    Collaborators

    • wheeyls